
The final price tag for the notorious High Speed 2 bat tunnel is on track to be a fifth higher than previously thought, figures obtained by the Financial Times show.
HS2 chair Sir Jon Thompson told a rail industry conference in November that the conservation project would cost £100mn — a number that swiftly entered public consciousness.
您已阅读8%(404字),剩余92%(4631字)包含更多重要信息,订阅以继续探索完整内容,并享受更多专属服务。