商业快报

Cost of HS2 ‘bat tunnel’ 20% higher than previously thought

Final price expected to be £119mn, with work completed next year
The tunnel is designed to protect a colony of rare Bechstein’s bats

The final price tag for the notorious High Speed 2 bat tunnel is on track to be a fifth higher than previously thought, figures obtained by the Financial Times show.

HS2 chair Sir Jon Thompson told a rail industry conference in November that the conservation project would cost £100mn — a number that swiftly entered public consciousness.

您已阅读8%(404字),剩余92%(4631字)包含更多重要信息,订阅以继续探索完整内容,并享受更多专属服务。
版权声明:本文版权归manbetx20客户端下载 所有,未经允许任何单位或个人不得转载,复制或以任何其他方式使用本文全部或部分,侵权必究。
设置字号×
最小
较小
默认
较大
最大
分享×