In October, a train with 30 coal wagons left Ulan Bator destined for the Russian port of Vostochny, the first rail freight service to link the Mongolian capital with the Pacific coast. It took four days to travel the 4,769km.
去年10月,一趟拉着30车皮煤炭的列车离开乌兰巴托驶向俄罗斯的东方港。这是连接蒙古国首都与太平洋沿岸的首趟铁路货运列车,全程需时4天,行程4769公里。
您已阅读3%(301字),剩余97%(8416字)包含更多重要信息,订阅以继续探索完整内容,并享受更多专属服务。