商业快报

An ambitious timetable to deliver the world’s newest fighter jet

UK, Italian and Japanese partnership aims to have a new generation of supersonic aircraft flying by 2035
Fighter jets are the most technologically complex and notoriously expensive aircraft

In hangar number five at BAE Systems’ sprawling factory in north-west England, test pilots are putting the world’s most advanced fighter jet through its paces. The pilots have already flown more than 170 hours over 125 outings but the jet itself has not yet been built; the flights have taken place inside a bespoke simulator in the cavernous space.

The virtual testing will help to inform live trials of a supersonic prototype aircraft scheduled to fly in 2027. It will be Britain’s first combat test aircraft since the Eurofighter Typhoon almost 40 years ago. It is also a critical first step if the UK and its partners Italy and Japan are to achieve their promise to have new generation aircraft flying by 2035 as part of the trilateral Global Combat Air Programme (GCAP).

您已阅读11%(858字),剩余89%(7139字)包含更多重要信息,订阅以继续探索完整内容,并享受更多专属服务。
版权声明:本文版权归manbetx20客户端下载 所有,未经允许任何单位或个人不得转载,复制或以任何其他方式使用本文全部或部分,侵权必究。
设置字号×
最小
较小
默认
较大
最大
分享×