西门子

Siemens boards Chinese rail bid

Siemens has dropped a bid to supply trains and equipment for the $7bn Mecca-to-Medina high-speed railway line project in Saudi Arabia, opting to join a Chinese consortium bidding for the work.

In a sign of the growing global competitiveness of Chinese rail manufacturers, Siemens abandoned its own bid as part of a consortium with the Saudi Binladin Group.

Instead, it has joined a bid led by state-owned China South Locomotive & Rolling Stock Corporation for the second phase of the Haramain high-speed rail project, according to people familiar with the situation.

您已阅读34%(564字),剩余66%(1089字)包含更多重要信息,订阅以继续探索完整内容,并享受更多专属服务。
版权声明:本文版权归manbetx20客户端下载 所有,未经允许任何单位或个人不得转载,复制或以任何其他方式使用本文全部或部分,侵权必究。
设置字号×
最小
较小
默认
较大
最大
分享×